S 2163 · 106th Congress · Water Resources Development
A bill to provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington.
Bill Progress
✓
Introduced2
Committee3
Senate Vote4
House5
EnactedLatest: Placed on Senate Legislative Calendar under General Orders. Calendar No. 937.(2000-10-04)
Plain Language Summary
[AI summary unavailable — showing source text]
Authorizes the Secretary of the Interior to study the engineering feasibility of exchanging water from the Columbia River for water historically diverted from the Yakima River as an alternative to providing for the electrification of the Chandler Pumping Plant and Powerplant operations at Prosser Diversion Dam, Washington.…
Summarized by Claude AI · Non-partisan · For informational purposes only
CBO Cost Estimate
Congressional Budget OfficeS. 2163, A bill to provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington
Sep 28, 2000Cost estimate for the bill as ordered reported by the Senate Committee on Energy and Natural Resources on September 20, 2000
Full CBO report ↗Official non-partisan budget analysis by the Congressional Budget Office