HR 1514 · 117th Congress · Energy
POWER ON Act
Bill Progress
✓
Introduced2
Committee3
House Vote4
Senate5
EnactedLatest: Referred to the Subcommittee on Energy.(2021-03-03)
Plain Language Summary
[AI summary unavailable — showing source text]
Prevent Outages With Energy Resilient Options Nationwide Act or the POWER ON Act This bill revises requirements governing the designation of a national interest electric transmission corridor. Currently, the Department of Energy (DOE) may designate any geographic area experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers. The bill expands the list of considerations DOE may use to select and designate a corridor. Specifically, DOE may consider whether the designation would (1) enhance the ability of facilities that generate or transmit renewable energy, low-emission energy, or emission-free energy to connect to the electric grid; (2) promote electrification of other sectors, including the transportation sector; or (3) facilitate other public policies to decarbonize the grid. DOE may also consider whether the designation maximizes existing rights-of-way, avoids sensitive environmental areas and cultural heritage sites, and would lower the cost of electricity for consumers. The bill also revises the authority (i.e., backstop authority) of the Federal Energy Regulatory Commission (FERC) to issue a permit for interstate transmissio…
Summarized by Claude AI · Non-partisan · For informational purposes only