S 1421 · 96th Congress · Energy
A bill to authorize the Secretary of the Interior to engage in feasibility studies of various potential hydroelectric power projects.
Bill Progress
✓
Introduced2
Committee3
Senate Vote4
House5
EnactedLatest: Referred to Senate Committee on Energy and Natural Resources.(1979-06-27)
Plain Language Summary
[AI summary unavailable — showing source text]
Directs the Secretary of the Interior to conduct feasibility studies of the following hydroelectric power projects: (1) Black Canyon Dam powerplant, Idaho; (2) Cle Elum and Tieton Dams powerplants, Washington; (3) Hungary Horse powerplant enlargement and reregulating reservoir, Montana; (4) Headgate Rock powerplant, Arizona; (5) Owyhee Dam powerplant, Oregon; (6) Potholes Canal Chute-Station 3480+45 powerplant, Washington; (7) Wickiup Dam powerplant, Oregon; (8) Tiber Dam powerplant, Montana; (9) New Siphon Drop powerplant, California; (10) Green Mountain Afterbay, Colorado; and (11) Alcova pumped-storage plant, Wyoming.…
Summarized by Claude AI · Non-partisan · For informational purposes only