S 1421 · 96th Congress · Energy

A bill to authorize the Secretary of the Interior to engage in feasibility studies of various potential hydroelectric power projects.

Introduced 1979-06-27· Sponsored by Sen. Hatfield, Mark O. [R-OR]· Senate

Bill Progress

Introduced
2
Committee
3
Senate Vote
4
House
5
Enacted
Latest: Referred to Senate Committee on Energy and Natural Resources.(1979-06-27)

Plain Language Summary

[AI summary unavailable — showing source text] Directs the Secretary of the Interior to conduct feasibility studies of the following hydroelectric power projects: (1) Black Canyon Dam powerplant, Idaho; (2) Cle Elum and Tieton Dams powerplants, Washington; (3) Hungary Horse powerplant enlargement and reregulating reservoir, Montana; (4) Headgate Rock powerplant, Arizona; (5) Owyhee Dam powerplant, Oregon; (6) Potholes Canal Chute-Station 3480+45 powerplant, Washington; (7) Wickiup Dam powerplant, Oregon; (8) Tiber Dam powerplant, Montana; (9) New Siphon Drop powerplant, California; (10) Green Mountain Afterbay, Colorado; and (11) Alcova pumped-storage plant, Wyoming.…

Summarized by Claude AI · Non-partisan · For informational purposes only

Cosponsors (8)

5 Democrats3 Republicans